POM’S dishonest bureaucrats are again loose on the channel dredging turbidity

The Port of Melbourne are blatantly manipulating the turbidity results on their testing of the effect of the Port Phillip Bay dredging. A small glitch occurred while the dredge was undertaking the most delicate task of all at the RIP (or the Heads). That small glitch meant that the turbidity testing was missing for 25 hours. Fortunately for the POM no data was recorded at all during this period. It will be certain to bring down the figures so that the POM won’t have to report any untoward dredging.

This is the usual shit from POM. The last I was involved in was the challenge they made to my documentary’s (The Last Good Summer) figures on the economy.

The documentary could only be shown at the former Premier’s electoral office at a party meeting if POM supplied a senior economist to state how wrong the documentary’s figures were. Unfortunately for POM their figures were blasted out of the water a few days later and, on the strength of that, a new panel of “Yes” people was hastily drawn together for a reinforcement of the government’s proposal.

Advertisements

There are no comments on this post.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: